Every Head.Every Hanger.Every Code.
Licensed sprinkler fitting, testing & inspection — documented to the page.
No form on this page — click through and we'll scope your project in under 10 minutes.
In business
Systems installed & inspected
Fully compliant documentation
Emergency response
New Construction
Rough-in done right before the slab goes down.
We coordinate with your GC schedule to run CPVC and black steel ahead of drywall — every hanger spaced to NFPA 13 table, every head placement on the stamped drawing. Inspectors sign off because the work matches the plans, not the other way around.
- Hydraulic calculations submitted with permit package
- Coordination with structural and mechanical BIM models
- ITM tag installed at every riser — inspection-ready from day one
New construction systems installed
CO deadline pass rate, 2022–2025
Client Testimony — New Construction · 180,000 sq ft Distribution Center
"Codebook pulled the permit, coordinated with the electricians, and had the rough-in signed off two days before our CO walk. That's the first time a sub has ever made my deadline easier."
Marcus Delgado
Senior Project Manager · Vantage Construction Group
Tenant Improvement Retrofits
New tenant, new layout — coverage that follows the ceiling plan.
When a TI moves walls and ceilings, your existing head layout fails NFPA 13 coverage requirements. We reroute, add heads, and update the hydraulic model so the fire marshal's inspector walks a space that matches the current drawings — not the 1998 originals.
- As-built drawings updated and submitted to AHJ within 5 business days
- Occupied-building work protocols — no forced shutdowns
- Impairment permits pulled and logged before every valve touch
TI retrofit scopes completed
Average impairment window, occupied buildings
Client Testimony — TI Retrofit · 4-Floor Hospital Wing, Occupied
"We had a hospital wing retrofit with a 60-hour window. Codebook brought a four-person crew, pulled the impairment permit before 7 AM, and had the system back in service with updated as-builts by the time the day shift arrived."
Renata Okonkwo
Director of Facilities · Meridian Health Systems
Five-Year Inspections
Every obstruction test logged. Every deficiency documented before the marshal asks.
NFPA 25 requires internal obstruction investigations every five years — and most facilities don't know they're overdue until a deficiency notice arrives. We conduct the inspection, photograph every finding, and deliver a signed test report the same day so you have paperwork in hand before any conversation with the AHJ.
- NFPA 25 full compliance inspection with written ITM report
- Same-day delivery of signed test report, photos, and deficiency list
- Corrective work quoted within 24 hours of inspection findings
NFPA 25 inspections completed
Signed report delivery guarantee
Client Testimony — Five-Year Inspection · 12-Building Industrial Park
"The fire marshal gave us 30 days to produce documentation on our five-year inspection. Codebook was on site in 48 hours, ran the full NFPA 25 obstruction investigation, and handed me a bound report with photos before I left the building. We closed the deficiency in two weeks."
Tom Brierley
VP of Asset Management · Cornerstone Industrial REIT
The paperwork is part of the job.
We deliver both.
Tell us your scope — new rough-in, a TI, or an overdue five-year inspection. We'll confirm coverage, pull the permit, do the work, and hand you a signed report the same day.